This is the new toilet waiting to be installed in the bathroom off the kitchen.
Joe has been working on the hall bath. It was looking good. So I had the first shower. Joe asked how it was and I said the draining was a little slow. So he got the draino out and put some down. The next day he asked again how it was and I replied that it drained like it had a hole down somewhere. He ran down to the basement and sure enough it had a hole depositing the water into the crawlspace. Joe couldn't make himself climb back in the crawlspace so he called a plummer to come out next week. Back to using the bath off the kitchen. This morning Joe was in the basement trying to decide how to cut up the old oil tank when I flushed the toilet and the water came splashing down to the oil tank. So this is his solution. New toilet. If he has trouble we still have a plummer coming out next week. Both baths won't have a toilet though. There isn't a toilet in the hall bath because Joe has to put the walls around up and he can't do that till the drain in the tub is fixed. Well if all else fails we can go out to use the bath in the camper.
No comments:
Post a Comment